Introduction
NAT gateway SNAT ports exhausted after migration when connection count high. This guide provides step-by-step diagnosis and resolution.
Symptoms
Typical error output:
Error: Migration operation failed
Check migration logs for details
Verify source and target configurationCommon Causes
- 1.Insufficient network bandwidth for data transfer
- 2.Configuration mismatch between source and target
- 3.Timeout values too short for data volume
- 4.Dependencies not properly sequenced
Step-by-Step Fix
Step 1: Check Current State
# Check migration status
cat /var/log/migration/status.log
# Verify target connectivity
ping target-server
curl -I https://target-endpoint/healthStep 2: Identify Root Cause
# Check migration logs
tail -f /var/log/migration/migration.log
# Verify source state
ssh source-server "systemctl status application"
# Check target state
ssh target-server "df -h && free -m"Step 3: Apply Primary Fix
```bash # Primary fix: Verify and reconfigure migration # Check current status migration-tool status --verbose
# Adjust parameters migration-tool config --bandwidth 1Gbps --timeout 8h
# Resume migration migration-tool resume --verify-integrity ```
Step 4: Apply Alternative Fix
```bash # Alternative: Manual verification # Check data consistency rsync -avz --dry-run source/ target/
# Verify network throughput iperf3 -c target-server
# Check logs grep -i error /var/log/migration/*.log ```
Step 5: Verify the Fix
# Verify migration completed
migration-tool verify --source <source> --target <target>
# Run smoke tests
./scripts/smoke-test.sh target-endpoint
# All checks should passCommon Pitfalls
- Not testing migration with production-like data volume
- Insufficient network bandwidth allocation
- Forgetting to update DNS TTL before cutover
- Not running data validation after migration
Best Practices
- Create detailed migration runbook
- Test migration multiple times in staging
- Have rollback plan ready
- Monitor closely during and after migration